Specialist Resin Bound Surfacing Installation with a 25-Year Guarantee
South Cambs Resin Bound specialise in the transformation of commercial and residential spaces using environmentally friendly, SUDS compliant, hardwearing and permeable paving systems.

Fast Installation Low Maintenance
VUBA systems can often be installed in just 1–2 days and require minimal upkeep – no need for regular sealing, sanding, or weed removal as with block paving or asphalt.

Permeable and SUDS Compliant
Unlike traditional materials, VUBA resin surfaces are fully permeable, helping to prevent puddles and comply with Sustainable Urban Drainage Systems (SUDS) regulations.

Weed and Crack Resistant
Resin-bound surfaces resist weed growth and cracking, unlike block paving which often suffers from joint movement and weed invasion.
With 40+ colour blends, we guarantee the perfect look to compliment your home
Enjoy peace of mind with a surface built to last, backed by trusted Vuba technology.
















































High-Performance Resin Surfaces with a 25-Year Guarantee
Click the button bellow to fill out our inquiry form and our team will reach out ASAP.
Fast Installation with Long-Lasting Results
VUBA systems can often be installed in just 1–2 days, curing quickly and lasting up to 25 years with proper care. We mix the resin and aggregate on-site to create a strong bond between stone and resin, delivering a finish that outlasts traditional materials. Whether you want to install a resin bound surface or prefer a resin bonded look, our team can advise on the best option. We lay resin bound systems with speed and precision for durable, low-maintenance results.
Vuba Resin Bound Top Layer Only
Suitable for resurfacing over structurally sound, pre-prepared bases.
Includes:
- Vuba resin bound top surface only
£76 per m²
Resin Bound Installation over VubaMac Base
Ideal for installations where sub-base already exists or requires minimal preparation.
Includes:
- VubaMac resin bound base layer
- Vuba resin bound decorative top layer
£140 per m²
Full Excavation & Premium Installation
Best for start-to-finish transformations and premium outdoor projects.
Includes:
- Full ground dig out and preparation
- London Stone paver edging
- Drainage installation
- Plant hire (muck away included)
- Full garden and surface design service
- VubaMac structural base
- Vuba resin bound top layer
£185 per m²
25 YEAR TRUSTED GUARANTEE


We use the Vuba sub-base make-up for durability and performance
Base build up:
Surface
18mm-20mm
SRM Mid-Layer
The SRM spreads the load and allows fast overlayment
Base Coarse Layer
30mm-35mm
SRM Base-Layer
This provides structural support and load bearing capacity
Capping Layer
25mm of 5-10mm angular stone
No Fines Stone
125mm-225mm
Geotextile Membrane
Sub-Soil

Advantages of South Cambs Resin Bound VubaMac
Sub-base | Depth | Flexibility | Strength | Cure Time |
---|---|---|---|---|
Permeable Asphalt | 40-70mm | Excessive | Low | 1-2 Days |
Permeable Concrete | 100-150mm | Limited | High | 7 Days |
VubaMac Base | 15-35mm | Flexible | High | 2 Hours |
Sub-Base Guidance
The entire system is dependent upon the integrity of the sub-base to be successful. Therefore it is importance careful attention is paid to this part of the process.
Geotextile Membrane:
A non-woven geotextile membrane is installed under the sub-base. This not only acts as a permeable separation barrier layer, which contains the substrate and stops it migrating and contaminating the sub-base above, but also provides structural support, spreading weight from above in a uniform fashion.
Suitable Granulometry:
Because you are installing a permeable system, all precipitation will eventually meet the sub-base. That means that if you have a sub-base with lots of fines, when the rainwater runs through it can swell or the fines will wash away. This is called ground heave. Conversely, an existing wet sub-base of fines will shrink once it begins to dry. A “no-fines” sub-base is therefore important. For a standard 150mm sub-base, we recommend 125mm of a 25-50mm clean stone, and then a 25mm capping layer of a 5-10mm stone.
Suitable Depth:
The standard depth is 150mm. However, the depth of sub-base required may deviate from the standard, dependent upon the sub-soil and / or other factors. For more information about Sub-Soils and how that might impact the sub-base, please see our Vuba Sub-Soils Datasheet. A "no-fines" sub-base is therefore important. For a standard 150mm sub-base, we recommend 125mm of a 25-50mm clean stone, and then a 25mm
capping layer of a 5-10mm stone.
Suitable Compaction:
Wherever possible, large compaction equipment like vibratory rollers should be used. Failing that, compactor plates can be used, but it’s worthwhile compacting in layers to ensure complete compaction throughout to prevent future ground settlement.
Aftercare
Immediate Aftercare
Curing time
Do not walk on your new Resin Bound surface for 24-48 hours, and do not drive on resin for 48-72 hours after installation. These times are temperature dependent and we would recommend you always follow the installer’s advice for exact timings.
No leaks/drips
Ensure there are no leaks/drips on the curing resin because excess moisture will significantly weaken and discolour Resin Bound surfaces during the curing period. Continuous drips/leaks cause erosion in the long term, and will degrade the surface.
Footprints
Ensure pesky people or animals cannot walk on the Resin Bound surface. Footprints cannot be removed! Devices can be used to deter animals, and we would recommend to place tape/barriers around the perimeter.
5 Most Important Points to Remember
Static wheel/small turning circles
Pressure exerted from static turning can dislodge surface aggregates. Once the matrix has broken, the surface will weaken and break away. It is very important that vehicle wheels are not turned when static or slow moving, and small turning circles should be eliminated in the driveway design.
Impact damage/high point loads
Take care not to drop heavy equipment on to the driveway, such as the placement of skips. Also be aware - skips can often leach rust on to your driveway which you may not be able to clean. Car jacks can depress the surface of Resin Bound and should be placed on a wooden board for load distribution.
Chemicals and staining
Petrol, solvents, etc. should not come into contact with resin surfacing ideally. In the event of spillages, dilute and clean immediately. Solvents and some chemicals will degrade the resin binder, resulting in stone loosening over a period of time.
Leaching/Discolouration
Like all paving surfaces, Resin Bound will discolour if covered long term permanently with a close contact object. Discolouration occurs from leaching and lack of exposure to air/sunlight. An example would be a flat bottom plant pot or a storage box. Use raised plant pots, and do not store items like storage boxes on the surface.
Rejuvenating your surface
A great way to extend the life of your driveway is by sealing the surface after a deep clean. This can be done using a diluted polyurethane UV resin sealer – contact your installer for more information. A good time to carry out this enhancement would be 2-4 years after installation of the resin surface.
Enjoy peace of mind with a surface built to last
Click the button bellow to fill out our inquiry form and our team will reach out ASAP.






